12 weeks before through wedding day. Tent-specific tasks like permit confirmation, anchor walkthrough, and weather contingency.
What you're getting
Generic wedding checklists assume you're using a venue with built-in everything. Tented weddings have extra steps: permit timing, anchor walkthrough with the rental crew, weather contingency, sidewall callbacks, generator delivery. This checklist sequences all of it.
What's included
- ✓12 weeks out: permit research and tent reservation
- ✓8 weeks out: vendor confirmations, insurance application
- ✓4 weeks out: walkthrough with rental company
- ✓1 week out: weather contingency review, anchor confirmation
- ✓Day before: setup arrival, sidewall installation
- ✓Wedding day: timeline with tent-specific touchpoints
- ✓Post-event: takedown coordination, damage walkthrough
Who it's for
Anyone planning a tent wedding who hasn't done it before.
How delivery works
- Click checkout, complete payment via Stripe
- Your download link arrives by email within seconds
- Save the email, your link is permanent and unique to you
- Use the file in Canva, Google Sheets, or print as PDF
